What evidence is needed for a network access permit? Direct answer

The core file contains the MIIT application form, applicant and manufacturer evidence, quality-system and after-sales information, a product description, and an accepted test report or product certificate. Some equipment also needs a technical plan and at least three months of network-trial evidence.

The exact checklist depends on the current MIIT equipment-directory entry and applicant structure. Foreign manufacturers apply through a Chinese agent and provide registration and authorization records.

Author
Sorena AI
Published
Jul 5, 2026
Updated
Jul 24, 2026
Overview

The exact evidence for a depends on the equipment's current MIIT directory entry, the applicant and manufacturer relationship, and whether the equipment needs a or expert review. The standard file is in Chinese and includes the official application form, corporate and agency records, applicant and manufacturer capability information, quality-system evidence, a technical product description, and an accepted test report or product certification certificate. Wireless communication equipment, interconnection equipment and new telecom equipment also require a technical plan and a report from at least three months of testing on a Chinese telecom network or an MIIT-designated simulated network.

Search this module

Find a question or answer quickly

2 of 2 questions
Question 1

Short answer

Use the current equipment-directory entry to confirm the product name, applicable standards, required test scope and whether expert review applies. Do this before commissioning tests because a marketing name or radio module approval does not establish the finished product's network-access category.

All application materials must be in Chinese. A certificate or licence originally issued in another language needs a Chinese translation. Applications are submitted online through the MIIT network-access system; if the applicant does not use an electronic signature, the signed and sealed paper application form must reach MIIT by the time the decision is collected.

  • Application and legal identity: the official application form; the domestic applicant's business licence, or the foreign applicant's registration record; and, for a foreign applicant, the Chinese agent's licence and authorization letter.
  • Organization and quality: an applicant profile covering production conditions, instruments, quality assurance and after-sales measures; records for any legally required repair, replacement and return responsibilities; and the manufacturer's quality-system certificate or qualifying audit report.
  • Product and conformity: functions, performance indicators, block diagram, internal and external photographs, instructions, and a test report or product certification certificate from a recognized qualified body.
  • Conditional trial file: for wireless communication, interconnection or new telecom equipment, the overall technical plan and the trial body's report covering at least three months of network testing.
Question 2

Control the application and approved model

Retain the submitted version of every document, the online receipt, any correction request and response, expert-review materials when MIIT uses that process, the decision, and the final licence or trial approval. The service guide states a statutory 60-day decision period after acceptance of a complete, formally compliant application, with expert review taking up to 45 days outside that period. MIIT's 2023 reform separately states a 15-working-day administrative commitment after acceptance, except where a lawful reason prevents it; plan around the official case status rather than treating either period as a guaranteed launch date.

After approval, keep the commercial product consistent with the approved model. Record the new network-access mark design and placement, licence number and validity, associated product data, and any modification or manufacturer change. Since 1 March 2023, a new or changed contract manufacturer and a technical or appearance change that does not alter main functions or core components can be filed online without new testing or a new permit; a change to information shown on the licence follows the licence-change process.

  • Link every test sample, report, photograph, software version, antenna and hardware configuration to the exact model submitted.
  • Record why a and expert review do or do not apply, with the current directory entry used for that decision.
  • Keep the licence or trial approval, new network-access mark approval and associated data, public query result, expiry date, and renewal or change filings.
  • Treat the 2023 reforms as controlling where the older service-guide wording differs: trial approvals now have a two-year validity period, and qualifying product-family changes use online filing.
Primary sources

References and citations

jwxkwap.miit.gov.cn3 citations
Referenced sections
  • Current official service guide for scope, applicant conditions, application materials, online filing, review, approval and post-approval duties.
  • Sections 7-10 list applicant conditions, Chinese-language requirements, the seven application-material groups, foreign-applicant agency records, network-trial evidence and online submission.
  • Supports application receipts and corrections, statutory review timing, expert review, approval records, consistency, renewal and change controls.
miit.gov.cn2 citations
Referenced sections
  • Official reforms effective 1 March 2023, including equipment removals, the administrative review commitment, two-year trial approvals and product-family change filings.
  • From 1 March 2023, sets the 15-working-day administrative commitment, extends trial approvals to two years, removes 11 equipment types from new licensing, and creates filing treatment for qualifying product-family changes.
miit.gov.cn2 citations
Referenced sections
  • Official requirements for applying, displaying and maintaining records for the new network-access mark.
  • Sets the design, application, display and linked-data records for the new mark; from 1 January 2024 MIIT no longer issues the former paper mark.
Show all related guides (17)

China telecom and wireless deadlines and compliance calendar

China telecom and wireless commencement dates, permit lead times, renewals, transitions, and change-triggered filings.

China telecom and wireless equipment requirements

China network access, radio management, micro-power equipment, and mobile terminal app requirements for connected-device launch teams.

China Telecom and Wireless FAQ

China connected-device FAQ covering network access permits, radio model approval, station licensing, 2400/5100/5800MHz rules and preinstalled mobile apps.

China telecom and wireless launch checklist

Release-gate checklist for China network access permits, radio band rules, micro-power equipment and preinstalled mobile apps.

China telecom and wireless penalties and enforcement exposure

China penalties for unlicensed telecom equipment, radio model approval, station licensing, interference, and mobile app violations.

China Telecom Equipment Network Access Permit Workflow

Decide whether equipment needs a China network access permit, then prepare the applicant, test, application, mark, renewal and change evidence.

Connected device China launch workflow

Decide which China network-access, radio, micro-power and mobile-terminal app requirements apply to a connected-device model, then control the evidence through release.

Micro-power short-range radio equipment rules

How to use the micro-power short-range radio equipment catalogue and technical requirements in China launch triage.

Mobile terminal preinstalled app requirements

China mobile smart terminal preinstallation and distribution duties for device makers and app distribution workflows.

Network access permit application evidence template

Model-level evidence index for a China telecom equipment network-access permit, from catalogue decision and applicant records through trial evidence, filing, approval and renewal.

Preinstalled app user rights and removal checks

Practical checks for mobile terminal preinstalled app distribution, user-facing controls, and cited evidence.