ProductChina

China Telecom and Wireless telecom and wireless launch checklist

Release-gate checklist for China network access permits, radio band rules, micro-power equipment and preinstalled mobile apps.

A release-gate checklist for classifying the finished model, selecting each applicable China approval route, collecting evidence and reopening the decision after product or software changes.

Author
Sorena AI
Published
Jul 5, 2026
Updated
Oct 15, 2026
Overview

Complete each applicable track independently and assign an owner to every yes, no or unresolved decision. A single connected product may need a , , a deployment-specific station licence and mobile-terminal app controls at the same time. Do not release while a route remains unresolved.

Section 1

1. Freeze the product facts

The manufacturer or China applicant should freeze the facts for the finished model and China build before asking a laboratory or supplier which certificate is needed. The expected evidence is a dated model dossier approved by engineering and regulatory owners.

  • Legal manufacturer, applicant or China agent, production site and model identifier.
  • Public-network interfaces and intended telecom functions.
  • Every radio module, band, channel, output power, antenna and indoor/outdoor use case.
  • Operating system, preinstalled apps, app-distribution channel and whether users can install and uninstall apps.
  • Evidence that supplier certificates, reports and module settings cover the finished product configuration rather than only a component or different regional variant.
Section 2

2. Decide and execute each route

The regulatory owner should write a separate yes, no or unresolved conclusion for network access, , micro-power treatment, station licensing and mobile-terminal apps. Each conclusion needs the controlling source, product facts, approver and next action.

  • Check the current MIIT telecom equipment catalogue and the 2023 reform notice. Eleven named equipment types no longer accept new permit applications, while satellite internet and functional-virtualization equipment were added to the system.
  • For 2400/5100/5800 MHz transmitters, verify band, radio-frequency characteristics, antenna, /, interference-avoidance and Internet Protocol version 6 (IPv6) requirements that apply to the product.
  • Use the micro-power route only when the equipment is listed and meets every catalogue condition.
  • For a covered mobile terminal, classify each preinstalled app under the closed basic-function list effective 1 January 2023, then approve user notices, consent behavior, removability and preinstalled-app consistency before release.
  • For an outdoor 2400 MHz or 5800 MHz access point, broadband-access central station or point-to-point station, compare with 20 dBm or 30 dBm respectively. Both the outdoor condition and the applicable threshold exceedance must be present before this notice requires a provincial station licence.
Section 3

3. Hold the launch evidence

The launch owner should not release on a supplier statement alone. The file should let another reviewer reconstruct every conclusion and match the production unit to the approved or tested configuration.

  • Signed route matrix with source, owner, date and unresolved assumptions.
  • Application materials, Chinese translations, test reports, review correspondence, permit or trial approval, and the approved design and placement evidence for the new mark.
  • Radio test configuration, antenna bill of materials, model approval or micro-power rationale and any station license.
  • China app inventory, permission and personal-information notices, uninstall and upgrade-restoration tests, complaint channel and change-report decision.
  • For a telecom terminal using an electronic mark, place the new mark or the Chinese statement that the product has network access permission on the smallest product package. Explain the mark location and viewing method in the instructions, accompanying material or official website.
Section 4

4. Calendar changes and renewals

The certificate owner should calendar the permit and change dates. Network access permits are generally valid for three years. Since 1 March 2023, trial approvals for in-scope new equipment without national or industry standards are valid for two years. Apply again three months before a permit expires when production and sale will continue.

  • Classify technical, exterior, contract-manufacturer and certificate changes under the 2023 product-family rules. Changes that do not affect the main function or core components may require an online filing rather than new testing or a new permit; changes to licence particulars require the prescribed information-change procedure.
  • Reassess any radio module, antenna, band, power or deployment change.
  • Report newly added preinstalled apps or major function changes where the mobile-terminal provisions require it.
  • Recheck the current telecom equipment catalogue and governing source before a new model, renewal or material variant; catalogue and technical-rule changes can reopen a conclusion even when the hardware did not change.
  • Do not use the historical 2020, 2022 or 2023 transition dates as recurring annual deadlines.
Operationalize the requirement

Prepare the China connected-device launch file

Connect the applicable China route, cited source, accountable owner, approval, product configuration and change history in one reviewable model file.

Primary sources

References and citations

miit.gov.cn3 citations
Referenced sections
  • Supports the current catalogue adjustments, 15-working-day review commitment, two-year trial approval and simplified treatment of specified product-family changes.
  • Identifies equipment removed from and added to licensing, the 15-working-day review commitment, two-year trial approval and simplified product-family change treatment from 1 March 2023.
  • Sets the two-year trial-approval period and the filing route for specified contract-manufacturer, technical and exterior changes from 1 March 2023.
miit.gov.cn2 citations
Referenced sections
  • Supports the current basic-function categories, removal rule and manufacturer-responsibility controls effective 1 January 2023.
  • Narrows the basic-function categories and requires all other preinstalled apps to be removable from 1 January 2023.
miit.gov.cn2 citations
Referenced sections
  • Supports the mark design-use, display, packaging and information-maintenance checks.
  • Sets the new mark's design-use approval, permitted display methods, packaging and user-information conditions, and associated data maintenance.
Show all related guides (17)

China Telecom Equipment Network Access Permit Workflow

Decide whether equipment needs a China network access permit, then prepare the applicant, test, application, mark, renewal and change evidence.

Connected device China launch workflow

Decide which China network-access, radio, micro-power and mobile-terminal app requirements apply to a connected-device model, then control the evidence through release.

Micro-power short-range radio equipment rules

How to use the micro-power short-range radio equipment catalogue and technical requirements in China launch triage.

Mobile terminal preinstalled app requirements

China mobile smart terminal preinstallation and distribution duties for device makers and app distribution workflows.

Network access permit application evidence template

Model-level evidence index for a China telecom equipment network-access permit, from catalogue decision and applicant records through trial evidence, filing, approval and renewal.

Preinstalled app user rights and removal checks

Practical checks for mobile terminal preinstalled app distribution, user-facing controls, and cited evidence.

Do preinstalled mobile apps have special China requirements?

Yes. Covered mobile smart terminals have China-specific duties for app disclosure, consent, uninstallability, upgrade behavior, distribution controls and network-access consistency.

Does my connected device need a China network access permit?

Not every connected device needs a China network access permit. Check public-network connection, the current MIIT equipment directory, and the 2023 licensing reforms.

Is radio management separate from network access in China?

Yes. China network access and radio management use different scope tests and approvals. A product can need both, one, or neither.

What changed for 2400MHz, 5100MHz and 5800MHz equipment?

MIIT's 2021 notice revised band uses, radio technical limits, interference controls, model approval and station licensing for 2400MHz, 5100MHz and 5800MHz equipment.

What evidence is needed for a network access permit?

China network-access permit evidence: Chinese application forms, applicant and manufacturer records, quality evidence, product description, test or certification records, and any required network-trial file.