China Telecom and Wireless telecom and wireless launch checklist

Release-gate checklist for China network access permits, radio band rules, micro-power equipment and preinstalled mobile apps.

A release-gate checklist for classifying the finished model, selecting each applicable China approval route, collecting evidence and reopening the decision after product or software changes.

Author
Sorena AI
Published
Jul 5, 2026
Updated
Jul 24, 2026
Sections
4

Structured answer sets in this page tree.

Primary sources
8

Cited legal and guidance references.

Publication metadata
Sorena AI
Published Jul 5, 2026
Updated Jul 24, 2026
Overview

Complete each applicable track independently and assign an owner to every yes, no or unresolved decision. A single connected product may need a network access permit, radio model approval, a deployment-specific station licence and mobile-terminal app controls at the same time. Do not release while a route remains unresolved.

Section 1

1. Freeze the product facts

The manufacturer or China applicant should freeze the facts for the finished model and China build before asking a laboratory or supplier which certificate is needed. The expected evidence is a dated model dossier approved by engineering and regulatory owners.

  • Legal manufacturer, applicant or China agent, production site and model identifier.
  • Public-network interfaces and intended telecom functions.
  • Every radio module, band, channel, output power, antenna and indoor/outdoor use case.
  • Operating system, preinstalled apps, app-distribution channel and whether users can install and uninstall apps.
  • Evidence that supplier certificates, reports and module settings cover the finished product configuration rather than only a component or different regional variant.
Section 2

2. Decide and execute each route

The regulatory owner should write a separate yes, no or unresolved conclusion for network access, radio model approval, micro-power treatment, station licensing and mobile-terminal apps. Each conclusion needs the controlling source, product facts, approver and next action.

  • Check the current MIIT telecom equipment catalogue and the 2023 reform notice. Eleven named equipment types no longer accept new permit applications, while satellite internet and functional-virtualization equipment were added to the system.
  • For 2400/5100/5800 MHz transmitters, verify band, RF, antenna, TPC/DFS, interference-avoidance and IPv6 requirements that apply to the product.
  • Use the micro-power route only when the equipment is listed and meets every catalogue condition.
  • For a covered mobile terminal, classify each preinstalled app under the closed basic-function list effective 1 January 2023, then approve user notices, consent behavior, removability and preinstalled-app consistency before release.
  • For an outdoor 2400 MHz or 5800 MHz access point, broadband-access central station or point-to-point station, compare EIRP with 20 dBm or 30 dBm respectively. Both the outdoor condition and the applicable threshold exceedance must be present before this notice requires a provincial station licence.
Section 3

3. Hold the launch evidence

The launch owner should not release on a supplier statement alone. The file should let another reviewer reconstruct every conclusion and match the production unit to the approved or tested configuration.

  • Signed route matrix with source, owner, date and unresolved assumptions.
  • Application materials, Chinese translations, test reports, review correspondence, permit or trial approval, and the approved design and placement evidence for the new network access permit mark.
  • Radio test configuration, antenna bill of materials, model approval or micro-power rationale and any station license.
  • China app inventory, permission and personal-information notices, uninstall and upgrade-restoration tests, complaint channel and change-report decision.
Section 4

4. Calendar changes and renewals

The certificate owner should calendar the permit and change dates. Network access permits are generally valid for three years. Since 1 March 2023, trial approvals for in-scope new equipment without national or industry standards are valid for two years. Apply again three months before a permit expires when production and sale will continue.

  • Classify technical, exterior, contract-manufacturer and certificate changes under the 2023 product-family rules. Changes that do not affect the main function or core components may require an online filing rather than new testing or a new permit; changes to licence particulars require the prescribed information-change procedure.
  • Reassess any radio module, antenna, band, power or deployment change.
  • Report newly added preinstalled apps or major function changes where the mobile-terminal provisions require it.
  • Recheck the current telecom equipment catalogue and governing source before a new model, renewal or material variant; catalogue and technical-rule changes can reopen a conclusion even when the hardware did not change.
  • Do not use the historical 2020, 2022 or 2023 transition dates as recurring annual deadlines.
Operationalize the requirement

Prepare the China connected-device launch file

Connect the applicable China route, cited source, accountable owner, approval, product configuration and change history in one reviewable model file.

Primary sources

References and citations

Related guides

Explore more topics

2400MHz, 5100MHz and 5800MHz radio equipment rules
Band-specific China radio management requirements, implementation timing, and equipment evidence for products using these bands.
China network access vs radio management
Crosswalk separating telecom network access licensing from radio transmitting equipment management for connected products.
China telecom and wireless deadlines and compliance calendar
China telecom and wireless commencement dates, permit lead times, renewals, transitions, and change-triggered filings.
China telecom and wireless equipment requirements
China network access, radio management, micro-power equipment, and mobile terminal app requirements for connected-device launch teams.
China Telecom and Wireless FAQ
China connected-device FAQ covering network access permits, radio model approval, station licensing, 2400/5100/5800MHz rules and preinstalled mobile apps.
China telecom and wireless penalties and enforcement exposure
China penalties for unlicensed telecom equipment, radio model approval, station licensing, interference, and mobile app violations.
China Telecom Equipment Network Access Permit Workflow
Decide whether equipment needs a China network access permit, then prepare the applicant, test, application, mark, renewal and change evidence.
Connected device China launch workflow
Decide which China network-access, radio, micro-power and mobile-terminal app requirements apply to a connected-device model, then control the evidence through release.
Do preinstalled mobile apps have special China requirements?
Yes. Covered mobile smart terminals have China-specific duties for app disclosure, consent, uninstallability, upgrade behavior, distribution controls and network-access consistency.
Does my connected device need a China network access permit?
Not every connected device needs a China network access permit. Check public-network connection, the current MIIT equipment directory, and the 2023 licensing reforms.
Is radio management separate from network access in China?
Yes. China network access and radio management use different scope tests and approvals. A product can need both, one, or neither.
Micro-power short-range radio equipment rules
How to use the micro-power short-range radio equipment catalogue and technical requirements in China launch triage.
Mobile terminal preinstalled app requirements
China mobile smart terminal preinstallation and distribution duties for device makers and app distribution workflows.
Network access permit application evidence template
Model-level evidence index for a China telecom equipment network-access permit, from catalogue decision and applicant records through trial evidence, filing, approval and renewal.
Preinstalled app user rights and removal checks
Practical checks for mobile terminal preinstalled app distribution, user-facing controls, and cited evidence.
What changed for 2400MHz, 5100MHz and 5800MHz equipment?
MIIT's 2021 notice revised band uses, radio technical limits, interference controls, model approval and station licensing for 2400MHz, 5100MHz and 5800MHz equipment.
What evidence is needed for a network access permit?
China network-access permit evidence: Chinese application forms, applicant and manufacturer records, quality evidence, product description, test or certification records, and any required network-trial file.