ProductChina

China Telecom and Wireless Mobile terminal preinstalled app requirements

China preinstallation and distribution duties for device makers and app distribution workflows.

Apply the 2017 manufacturer and app-distributor rules together with the stricter preinstallation notice effective 1 January 2023.

Author
Sorena AI
Published
Jul 5, 2026
Updated
Oct 15, 2026
Overview

A is a mobile communication terminal that connects to a public mobile network, has an operating system and lets users install and uninstall apps. Smartphones, tablets and qualifying wearables are representative examples; industrial terminals, special-purpose in-vehicle terminals and products that do not connect to a public mobile network fall outside the 2022 notice's explained terminal scope. The 2017 interim provisions regulate terminal manufacturers and app-distribution service providers. For manufacturer-preinstalled programs with a user-interaction entry on the main or auxiliary screen that can operate independently, also apply the 2022 MIIT-CAC notice effective 1 January 2023.

Section 1

Manufacturer and distributor duties

The 2017 provisions set the disclosure, consent, charging, channel and distribution controls. The 2022 notice supplements those provisions rather than replacing them: it narrows the removability exception, makes the company that preinstalls an app responsible for it, and requires manufacturers to prevent operating-system replacement and unauthorized app installation during product distribution. Apply the duties by role: a terminal manufacturer owns the factory image and channel controls, an app provider owns its app conduct and disclosures, a distribution platform owns review and traceability, and a billing provider owns billing confirmation records.

  • Do not collect personal information, start apps or bundle-promote other apps without clear notice and user consent; do not call terminal functions unrelated to the service.
  • Disclose app name, function, uninstall method, developer, required permissions and personal-information collection purpose, method and scope.
  • For paid apps, disclose price and charging method and obtain user confirmation before charging.
  • Control sales channels so apps are not installed without user consent and warn users about channel-installation risk.
  • Retain the production app list, disclosure screens, consent tests, channel controls and the person or entity that preinstalled each app as release evidence.
Section 2

Uninstallability and build consistency

All preinstalled apps outside the current must have a safe and convenient uninstall method. Under the 2017 provisions, associated resource, configuration and user-data files must also be conveniently removable when that does not affect safe terminal use.

  • The current is closed: system settings and file management; multimedia capture; calls, text messages, contacts and browser; and the app store. A label such as system app or vendor service does not add another category.
  • At most one performing the same basic function may be set as non-uninstallable.
  • Do not forcibly restore an app after the user removes it during an operating-system upgrade.
  • Keep preinstalled software consistent before and after network access permission; report newly added preinstalled software or major function changes to MIIT in a timely manner.
Section 3

Distribution-platform controls

App stores and manufacturers that preinstall distribution platforms have additional traceability duties.

  • Verify provider, operator and developer identity and contact information.
  • Review and test apps, monitor them after publication, remove unlawful or malicious apps and operate complaints handling.
  • Disclose requested terminal permissions and their purpose.
  • Retain app, version, launch time, function, purpose, MD5 checksum (a file fingerprint) and server-access information for at least 60 days.
  • Keep charging confirmations and original billing data for at least five months where providing billing services.
Section 4

Supervision and effective date

The interim provisions took effect on 1 July 2017, and the supplemental MIIT-CAC preinstallation notice took effect on 1 January 2023. MIIT and provincial communications administrations supervise the 2017 duties; MIIT and CAC jointly supervise the 2022 preinstallation controls. Authorities can require correction or app removal, and administrative penalties under the applicable law may be recorded and published.

  • Maintain a complaint and report channel and respond within the published or required period.
  • Support regulator and testing-body access for supervision testing.
  • Keep software-build evidence tied to the exact terminal model and network-access record.
Operationalize the requirement

Prepare the China connected-device launch file

Connect the applicable China route, cited source, accountable owner, approval, product configuration and change history in one reviewable model file.

Primary sources

References and citations

miit.gov.cn5 citations
Referenced sections
  • Official MIIT text for manufacturer and distributor duties effective 1 July 2017, including notice, consent, removal, traceability, complaints and supervision.
  • Official MIIT text for regulated actors, notice, consent, charging and distribution-channel duties effective 1 July 2017.
  • Supports removal of non-basic apps and associated files, the one-app-per-basic-function limit, upgrade non-restoration and network-access consistency duties.
Show 2 more
  • Official source for identity verification, review, monitoring, removal, permission disclosure, traceability and billing-data retention duties.
  • Sets the 1 July 2017 effective date, complaint handling, supervision testing, correction and app-removal framework.
miit.gov.cn4 citations
Referenced sections
  • Current supplemental preinstallation rules effective 1 January 2023, including the narrower basic-function list and manufacturer-responsibility controls.
  • Defines the preinstalled programs covered by the 2022 notice and adds manufacturer responsibility, permission-management and distribution-stage controls from 1 January 2023.
  • Sets the current closed list of basic-function categories and requires every other preinstalled app to be removable from 1 January 2023.
Show 1 more
  • Provides for joint MIIT-CAC supervision of preinstallation conduct from 1 January 2023.
Show all related guides (17)

China telecom and wireless penalties and enforcement exposure

China penalties for unlicensed telecom equipment, radio model approval, station licensing, interference, and mobile app violations.

China Telecom Equipment Network Access Permit Workflow

Decide whether equipment needs a China network access permit, then prepare the applicant, test, application, mark, renewal and change evidence.

Connected device China launch workflow

Decide which China network-access, radio, micro-power and mobile-terminal app requirements apply to a connected-device model, then control the evidence through release.

Micro-power short-range radio equipment rules

How to use the micro-power short-range radio equipment catalogue and technical requirements in China launch triage.

Network access permit application evidence template

Model-level evidence index for a China telecom equipment network-access permit, from catalogue decision and applicant records through trial evidence, filing, approval and renewal.

Preinstalled app user rights and removal checks

Practical checks for mobile terminal preinstalled app distribution, user-facing controls, and cited evidence.

Do preinstalled mobile apps have special China requirements?

Yes. Covered mobile smart terminals have China-specific duties for app disclosure, consent, uninstallability, upgrade behavior, distribution controls and network-access consistency.

Does my connected device need a China network access permit?

Not every connected device needs a China network access permit. Check public-network connection, the current MIIT equipment directory, and the 2023 licensing reforms.

Is radio management separate from network access in China?

Yes. China network access and radio management use different scope tests and approvals. A product can need both, one, or neither.

What changed for 2400MHz, 5100MHz and 5800MHz equipment?

MIIT's 2021 notice revised band uses, radio technical limits, interference controls, model approval and station licensing for 2400MHz, 5100MHz and 5800MHz equipment.

What evidence is needed for a network access permit?

China network-access permit evidence: Chinese application forms, applicant and manufacturer records, quality evidence, product description, test or certification records, and any required network-trial file.