QuestionChina

Is radio management separate from network access in China? Direct answer

Yes. Network access licensing asks whether a listed telecom product may connect to a public telecom network. Radio management asks whether a transmitter and its use comply with frequency, equipment and station rules.

Run both checks on the finished model and deployment. Model approval, a micro-power exception, and a radio station licence are also distinct decisions within the radio track.

Author
Sorena AI
Published
Jul 5, 2026
Updated
Jul 24, 2026
Questions
2

Structured answer sets in this page tree.

Primary sources
3

Cited legal and guidance references.

Publication metadata
Sorena AI
Published Jul 5, 2026
Updated Jul 24, 2026
Overview

Yes. China network access and radio management are separate. Network access licensing asks whether the finished product is listed telecom equipment that will connect to a public telecom network. Radio management asks whether its transmitters, frequency bands, power, antenna design and actual deployment comply with radio rules. The same product can need both approvals, only one, or neither. Within radio management, and a are separate decisions.

Search this module

Find a question or answer quickly

2 of 2 questions
Question 1

Short answer

For network access, identify the public-network connection and match the finished product to MIIT's current equipment directory. A permit or trial approval belongs to the listed telecom model, not automatically to every device containing an approved communications module.

For radio equipment, identify every transmitting function, frequency range, power, antenna and intended use. Radio transmitting equipment generally needs model approval unless a specific rule applies, such as a device that both appears in and complies with the MIIT micro-power short-range equipment catalogue. That exception does not remove product-quality, interference, instruction or other regulatory duties.

  • Network access output: directory classification, applicant, test and application file, permit or trial approval, mark and model-change controls.
  • Radio equipment output: transmitter and band inventory, technical-rule assessment, model approval or exact micro-power catalogue rationale, and antenna or power-change controls.
  • Deployment output: a separate decision based on location, indoor or outdoor use, station type and radiated power.
  • Keep the identifiers and approved configurations separate. One approval is not evidence that the other route is satisfied.
Citations
Question 2

Do not combine equipment and deployment decisions

A addresses the equipment design. A addresses setting up and using a station in a particular deployment. Under the 2021 rules for the 2400MHz and 5800MHz bands, a station licence is required for a wireless LAN access point, broadband wireless access centre station or point-to-point station only when it is outdoors and exceeds the stated equivalent isotropically radiated power threshold: more than 20 dBm at 2400MHz or more than 30 dBm at 5800MHz.

Other equipment in the 2400MHz, 5100MHz and 5800MHz bands does not need a station licence under that notice, but it still must meet the applicable technical and use rules. The 5100MHz band is indoor-only, excluding use in automobiles, and stations using it must remain more than 3 km from lawful same-band satellite earth stations.

  • Product file: finished-model block diagram, module integration, transmit bands, output power, antenna type and gain, firmware controls, model approval or micro-power rationale.
  • Network file: public-network purpose, current MIIT directory classification, permit status and approved model configuration.
  • Deployment file: station type, coordinates, indoor or outdoor setting, EIRP calculation, satellite-earth-station distance where relevant, station licence decision and operator.
  • Change trigger: reassess hardware, firmware, antenna, power, band, network function or deployment changes against all three records.
Citations
Primary sources

References and citations

Related guides

Explore more topics

2400MHz, 5100MHz and 5800MHz radio equipment rules
Band-specific China radio management requirements, implementation timing, and equipment evidence for products using these bands.
China network access vs radio management
Crosswalk separating telecom network access licensing from radio transmitting equipment management for connected products.
China telecom and wireless deadlines and compliance calendar
China telecom and wireless commencement dates, permit lead times, renewals, transitions, and change-triggered filings.
China telecom and wireless equipment requirements
China network access, radio management, micro-power equipment, and mobile terminal app requirements for connected-device launch teams.
China Telecom and Wireless FAQ
China connected-device FAQ covering network access permits, radio model approval, station licensing, 2400/5100/5800MHz rules and preinstalled mobile apps.
China telecom and wireless launch checklist
Release-gate checklist for China network access permits, radio band rules, micro-power equipment and preinstalled mobile apps.
China telecom and wireless penalties and enforcement exposure
China penalties for unlicensed telecom equipment, radio model approval, station licensing, interference, and mobile app violations.
China Telecom Equipment Network Access Permit Workflow
Decide whether equipment needs a China network access permit, then prepare the applicant, test, application, mark, renewal and change evidence.
Connected device China launch workflow
Decide which China network-access, radio, micro-power and mobile-terminal app requirements apply to a connected-device model, then control the evidence through release.
Do preinstalled mobile apps have special China requirements?
Yes. Covered mobile smart terminals have China-specific duties for app disclosure, consent, uninstallability, upgrade behavior, distribution controls and network-access consistency.
Does my connected device need a China network access permit?
Not every connected device needs a China network access permit. Check public-network connection, the current MIIT equipment directory, and the 2023 licensing reforms.
Micro-power short-range radio equipment rules
How to use the micro-power short-range radio equipment catalogue and technical requirements in China launch triage.
Mobile terminal preinstalled app requirements
China mobile smart terminal preinstallation and distribution duties for device makers and app distribution workflows.
Network access permit application evidence template
Model-level evidence index for a China telecom equipment network-access permit, from catalogue decision and applicant records through trial evidence, filing, approval and renewal.
Preinstalled app user rights and removal checks
Practical checks for mobile terminal preinstalled app distribution, user-facing controls, and cited evidence.
What changed for 2400MHz, 5100MHz and 5800MHz equipment?
MIIT's 2021 notice revised band uses, radio technical limits, interference controls, model approval and station licensing for 2400MHz, 5100MHz and 5800MHz equipment.
What evidence is needed for a network access permit?
China network-access permit evidence: Chinese application forms, applicant and manufacturer records, quality evidence, product description, test or certification records, and any required network-trial file.