ProductChina

China Telecom and Wireless Telecom equipment network access permit workflow

Decide whether equipment needs a China , then prepare the applicant, test, application, mark, renewal and change evidence.

Apply the current catalogue and the reforms effective 1 March 2023 before arranging tests. The general management measures, later reform notice and new-mark notice must be read together.

Author
Sorena AI
Published
Jul 5, 2026
Updated
Oct 15, 2026
Overview

Connectivity alone does not trigger a China . The finished model must be telecom terminal, radio communication or covered by the current system and intended to connect to a public telecom network. MIIT decides the permission through its authorized receiving body. Check the exact catalogue name, the current management measures and the reforms effective 1 March 2023 before arranging tests or assuming a legacy product still needs a new permit.

Section 1

Scope and applicant

The permit system covers listed , and that connect to public telecom networks. Telecom terminal equipment sits at the public-network endpoint and sends or receives user information; radio communication equipment connects to the public network by radio; interconnection equipment connects networks of different operators or different telecom services. The finished model must also match a current catalogue entry. Since 1 March 2023, MIIT no longer accepts new applications for 11 named legacy types, including fixed and cordless telephone terminals, fax machines, modems, wireless pagers and several switching products; satellite internet and functional-virtualization equipment were added.

  • A covered device needs a or, for qualifying new equipment without national or industry standards, a . The 2023 reform made trial approvals valid for two years.
  • An overseas applicant must appoint a China-based agent to submit the application.
  • Applicant and manufacturer identity, manufacturing capability, quality system and after-sales capability form part of the eligibility review.
  • For one of the 11 removed equipment types, do not file a new permit application. The manufacturer remains responsible for applicable product quality and telecom standards and must report newly marketed products from the preceding quarter through MIIT's platform in the first month of each quarter.
  • There is no numerical quota and MIIT charges no application fee under the service guide, but laboratory, certification, translation and trial work can still create project cost.
Section 2

Application and review

Materials must be in Chinese; foreign-language certificates or licences need Chinese translations. The exact list varies by equipment type. The authorized receiving body checks completeness, and MIIT makes the decision. A three-month network trial is application evidence for the stated equipment groups; it is not the two-year that MIIT may issue for qualifying new telecom equipment.

  • Application form, corporate registration and any manufacturing or overseas-agent authorization.
  • Quality-system certificate, product description, photographs, user information and conformity or test materials required for the equipment.
  • For radio transmitting equipment, include the MIIT radio transmitting equipment model-approval certificate unless an applicable radio rule provides an exemption.
  • For radio communication, interconnection or new equipment, include a technical plan and report from at least a three-month China network or MIIT-designated simulated-network trial where required.
  • Online submission through the MIIT government-service platform; MIIT may convene expert review.
  • If materials are incomplete or formally deficient, MIIT must identify all required corrections at once, either immediately or within five working days. Treat formal acceptance, not initial upload, as the start of the published review clock.
Section 3

Decision, marking and lifecycle

The management measures and service guide provide a 60-day review period for complete materials, with expert-review time excluded where applicable. MIIT separately committed in 2023 to decide applications within 15 working days after acceptance unless a statutory reason prevents it. Treat 15 working days as an administrative commitment, not a replacement for the legal maximum. MIIT sends the decision within 10 days after it is made.

  • Keep the approved device consistent before and after permission.
  • For a new permit, include the proposed design and use of the new . It may be displayed electronically, printed on the product, nameplate or packaging, or attached as a label under the approved plan.
  • The permit holder must file online when adding or changing a contract manufacturer or making technical or exterior changes that do not affect the main function or core components; no new testing or permit is required. Changes to licence particulars follow the prescribed information-change procedure.
  • A permit is valid for three years. Apply three months before expiry when production and sale will continue, submit a sample-test or product-quality supervision report issued within the preceding year, and return the original certificate.
  • From 1 January 2024, MIIT no longer issues the old paper mark, although an already issued paper mark remains usable during the permit's validity. Since the 2023 new-mark notice, the permit number no longer needs to be stated separately on packaging, built-in information or advertising.
  • For a telecom terminal using an electronic mark, place the new mark or the Chinese statement that the product has network access permission on the smallest product package. Explain the mark location and viewing method in the instructions, accompanying material or official website.
Operationalize the requirement

Prepare the China connected-device launch file

Connect the applicable China route, cited source, accountable owner, approval, product configuration and change history in one reviewable model file.

Primary sources

References and citations

miit.gov.cn3 citations
Referenced sections
  • Binding current text for equipment scope, application evidence, the three-month trial, permit validity, renewal, consistency and enforcement.
  • Defines telecom terminal, radio communication and interconnection equipment and ties the permit duty to public-network connection and the published directory.
  • Binding current text for application materials, the radio model-approval certificate, Chinese-language materials and the three-month trial requirement.
miit.gov.cn3 citations
Referenced sections
  • Current reforms to scope, decision commitment, trial-approval validity and product-family change treatment from 1 March 2023.
  • Lists the 11 equipment types removed from new applications, adds satellite internet and functional-virtualization equipment, and makes trial approvals valid for two years from 1 March 2023.
  • Sets the 15-working-day commitment and online-filing treatment for specified contract-manufacturer, technical and exterior changes.
miit.gov.cn2 citations
Referenced sections
  • Current rules for the mark design, application, display, packaging, maintenance and transition from the old paper mark.
  • Sets the current mark application and display routes, full rollout from 1 January 2024, continued validity of existing paper marks and the end of separate permit-number display.
Show all related guides (17)

China telecom and wireless penalties and enforcement exposure

China penalties for unlicensed telecom equipment, radio model approval, station licensing, interference, and mobile app violations.

Connected device China launch workflow

Decide which China network-access, radio, micro-power and mobile-terminal app requirements apply to a connected-device model, then control the evidence through release.

Micro-power short-range radio equipment rules

How to use the micro-power short-range radio equipment catalogue and technical requirements in China launch triage.

Mobile terminal preinstalled app requirements

China mobile smart terminal preinstallation and distribution duties for device makers and app distribution workflows.

Network access permit application evidence template

Model-level evidence index for a China telecom equipment network-access permit, from catalogue decision and applicant records through trial evidence, filing, approval and renewal.

Preinstalled app user rights and removal checks

Practical checks for mobile terminal preinstalled app distribution, user-facing controls, and cited evidence.

Do preinstalled mobile apps have special China requirements?

Yes. Covered mobile smart terminals have China-specific duties for app disclosure, consent, uninstallability, upgrade behavior, distribution controls and network-access consistency.

Does my connected device need a China network access permit?

Not every connected device needs a China network access permit. Check public-network connection, the current MIIT equipment directory, and the 2023 licensing reforms.

Is radio management separate from network access in China?

Yes. China network access and radio management use different scope tests and approvals. A product can need both, one, or neither.

What changed for 2400MHz, 5100MHz and 5800MHz equipment?

MIIT's 2021 notice revised band uses, radio technical limits, interference controls, model approval and station licensing for 2400MHz, 5100MHz and 5800MHz equipment.

What evidence is needed for a network access permit?

China network-access permit evidence: Chinese application forms, applicant and manufacturer records, quality evidence, product description, test or certification records, and any required network-trial file.