ProductChina

China Telecom and Wireless Connected device China launch workflow

Decide which China network-access, radio, micro-power and mobile-terminal app requirements apply to a connected-device model, then control the evidence through release.

Assess each finished model and deployment separately. A network-access permit, , and mobile-terminal software review have different scope tests and evidence.

Author
Sorena AI
Published
Jul 5, 2026
Updated
Oct 15, 2026
Overview

Start with the finished model and its intended China deployment. Check four separate questions: whether the model needs a because it is listed telecom equipment that will connect to a public telecommunications network; whether it contains radio transmitting equipment that needs ; whether every claimed meets the applicable catalogue conditions; and whether it is a subject to app-preinstallation controls. Complete every triggered track before release.

Section 1

Step 1: Build the model dossier

Create one controlled record for the exact model and production configuration. Name the applicant, manufacturer and production site; describe public-network interfaces and intended use; and list every transmitter, band, antenna, power setting, deployment environment, operating system and preinstalled app in the China build.

  • Record the network-access catalogue entry relied on, or the reason the model is outside the published catalogue. Public-network connectivity alone does not identify the catalogue entry.
  • Retain supplier permits, model approvals and test reports as inputs. Confirm that their models, radio parameters and permitted configurations cover the finished equipment and its intended use.
  • For a network-access application by an overseas entity, identify the agent in China that will act as applicant and retain the authorization and both entities' registration evidence.
  • Treat a hardware variant, antenna option, regional radio setting or software build as a separate review item when it changes a fact used in any scope or approval decision.
Section 2

Step 2: Run four routing decisions

The regulatory owner records a yes, no or unresolved answer for each route, the cited source and product facts, and the person responsible for the next action. A conclusion under one route does not decide the others, and an unresolved route blocks release.

  • Network access: a permit is required for equipment within the published telecom-equipment catalogue when it is connected to a public telecommunications network. Record the exact catalogue name and the product facts that match it; resolve an uncertain match before ordering permit testing.
  • : radio transmitting equipment operating in the 2400MHz, 5100MHz or 5800MHz bands must meet the current technical requirements and obtain model approval. The stated exceptions cover qualifying micro-power equipment and industrial, scientific and medical equipment that radiates radio waves but is not radio equipment. The 5100MHz band is limited to indoor use and excludes use inside vehicles.
  • Micro-power: the exemption applies only when the equipment is listed in and meets the conditions of MIIT Announcement No. 52 of 2019. Qualifying equipment does not need a radio-frequency use permit, radio station licence or radio transmitting equipment model approval, but the announcement's operating, interference and user-instruction conditions still apply.
  • Mobile-terminal apps: the rules apply to a terminal that connects to a public mobile communications network, has an operating system, and lets users install and uninstall apps. MIIT's 2022 interpretation identifies smartphones, tablets and wearables as principal examples and excludes industrial terminals, in-vehicle terminals for specific uses, and products that do not connect to a public mobile network.
Section 3

Step 3: Test, apply and approve

Prepare route-specific evidence against the current official checklist. For network access, materials must be in Chinese; foreign-language certificates and licences need Chinese translations. Apply online through the MIIT government-service platform.

  • For radio communication equipment, interconnection equipment and new telecom equipment, plan a network trial of at least three months on a telecommunications network in China or an MIIT-designated simulated test network. Retain the overall technical plan and the trial unit's report with the content specified in the service guide.
  • Retain the application form, entity records, applicant and manufacturing information, quality-system evidence, equipment description, and a report or product certificate from an eligible testing or certification body. Add the manufacturing agreement when applicant and manufacturer are different legal persons.
  • The management measures and service guide state a 60-day decision period for a complete, formally compliant application. MIIT's 2023 reform separately commits to a decision within 15 working days after acceptance unless a statutory reason prevents it. Expert review, when organized for the specified equipment types and technical material, is to be completed within 45 days and that time is excluded from the legal approval period.
  • For a covered , test that non-basic preinstalled apps can be uninstalled. Only one app for each narrowly listed basic function may be non-uninstallable. Confirm app disclosures, permissions and personal-information notices, and verify that an operating-system upgrade does not force an uninstalled preinstalled app to return.
Section 4

Step 4: Release and monitor changes

Release only when every triggered route has a dated decision, the production configuration matches the approved or tested configuration, and deployment conditions are documented.

  • Apply the approved network-access mark to equipment that obtained the permit. Since 1 January 2024, MIIT uses the new mark rather than issuing the old paper mark; the approved new mark may be displayed electronically, printed or attached by label. Keep the permit number, approved model, mark design and associated product data tied to the production record.
  • A network-access permit is generally valid for three years; the reform effective 1 March 2023 makes a trial approval valid for two years. If production and sale will continue, submit the renewal application three months before permit expiry, include a sample-test or product-quality supervision report from the preceding year, and return the original certificate.
  • Reassess technical or exterior changes to permitted telecom equipment because testing or a new permit may be required. A change to information stated on the permit requires the prescribed permit-information change procedure.
  • For wireless LAN access points, broadband wireless access central stations or point-to-point stations, document whether a provincial radio station licence is required. The notice requires one only when the station is outdoors and exceeds 20dBm in the 2400MHz band or 30dBm in the 5800MHz band. Record both facts and the responsible provincial authority.
  • Reopen the app review when the preinstalled app list changes or an app has a major function change. The 2016 provisions require timely reporting to MIIT for those changes.
Operationalize the requirement

Prepare the China connected-device launch file

Connect the applicable China route, cited source, accountable owner, approval, product configuration and change history in one reviewable model file.

Primary sources

References and citations

ythzxfw.miit.gov.cn5 citations
Referenced sections
  • Current MIIT government-service page for scope, conditions, materials, filing, review, validity, marking, changes and renewal.
  • States the public-network scope test, points applicants to the current equipment catalogue, and lists applicant, manufacturer, overseas-agent and application-material requirements.
  • States that listed telecom terminal equipment, radio communication equipment and interconnection equipment connected to a public telecommunications network require a network-access permit.
Show 2 more
  • Lists the Chinese-language application materials, online filing route, three-month trial trigger and report contents, 60-day decision period, and expert-review timing.
  • States marking, approved-versus-production consistency, change and renewal duties, and the general three-year validity period for permits.
wap.miit.gov.cn4 citations
Referenced sections
  • Official notice for band use, equipment design, model approval, technical requirements, station licensing and the micro-power cross-reference.
  • Requires the RF unit and antenna to be integrated or synchronously matched and prohibits unauthorized antenna substitution or an added RF power amplifier.
  • Sets band uses, the indoor-only condition for 5100MHz, equipment technical requirements, model-approval treatment and the micro-power cross-reference.
Show 1 more
  • Sets the outdoor station-licence triggers and EIRP thresholds and distinguishes equipment that does not require a station licence.
miit.gov.cn3 citations
Referenced sections
  • Official reforms effective 1 March 2023 for the 15-working-day commitment, two-year trial approvals and simplified product-family changes.
  • Sets the 15-working-day administrative decision commitment after acceptance.
  • Changes trial-approval validity to two years from 1 March 2023.
miit.gov.cn2 citations
Referenced sections
  • Official text establishes the 2016 MIIT provisions requiring app information disclosure, consent controls, uninstallability, non-restoration after an operating-system upgrade, preinstalled-software consistency and a network-access declaration.
  • Official text establishes the manufacturer duties to maintain preinstalled-software consistency and report newly preinstalled apps or major app-function changes.
miit.gov.cn2 citations
Referenced sections
  • Official notice effective 1 January 2023 that supplements the 2016 provisions and narrows the non-uninstallable basic-function app categories.
  • Effective 1 January 2023, narrows the basic-function categories whose preinstalled apps may be non-uninstallable and requires all other preinstalled apps to be uninstallable.
wap.miit.gov.cn2 citations
Referenced sections
  • Official catalogue-based exemption and the associated operating, interference and user-instruction conditions.
  • Limits the exemption to equipment listed in and compliant with the attached catalogue and requires specified operating conditions and user instructions.
miit.gov.cn2 citations
Referenced sections
  • Official current mark design, use, product-data and transition requirements.
  • Sets the current mark application, electronic, printed and label display methods and the 1 January 2024 transition from the old paper mark.
Show all related guides (17)

China telecom and wireless penalties and enforcement exposure

China penalties for unlicensed telecom equipment, radio model approval, station licensing, interference, and mobile app violations.

China Telecom Equipment Network Access Permit Workflow

Decide whether equipment needs a China network access permit, then prepare the applicant, test, application, mark, renewal and change evidence.

Micro-power short-range radio equipment rules

How to use the micro-power short-range radio equipment catalogue and technical requirements in China launch triage.

Mobile terminal preinstalled app requirements

China mobile smart terminal preinstallation and distribution duties for device makers and app distribution workflows.

Network access permit application evidence template

Model-level evidence index for a China telecom equipment network-access permit, from catalogue decision and applicant records through trial evidence, filing, approval and renewal.

Preinstalled app user rights and removal checks

Practical checks for mobile terminal preinstalled app distribution, user-facing controls, and cited evidence.

Do preinstalled mobile apps have special China requirements?

Yes. Covered mobile smart terminals have China-specific duties for app disclosure, consent, uninstallability, upgrade behavior, distribution controls and network-access consistency.

Does my connected device need a China network access permit?

Not every connected device needs a China network access permit. Check public-network connection, the current MIIT equipment directory, and the 2023 licensing reforms.

Is radio management separate from network access in China?

Yes. China network access and radio management use different scope tests and approvals. A product can need both, one, or neither.

What changed for 2400MHz, 5100MHz and 5800MHz equipment?

MIIT's 2021 notice revised band uses, radio technical limits, interference controls, model approval and station licensing for 2400MHz, 5100MHz and 5800MHz equipment.

What evidence is needed for a network access permit?

China network-access permit evidence: Chinese application forms, applicant and manufacturer records, quality evidence, product description, test or certification records, and any required network-trial file.