---
title: "EED Requirements (Directive (EU) 2023/1791)"
canonical_url: "https://www.sorena.io/artifacts/eu/energy-efficiency-directive/requirements"
source_url: "https://www.sorena.io/artifacts/eu/energy-efficiency-directive/requirements"
author: "Sorena AI"
description: "A practical requirements breakdown of the EU Energy Efficiency Directive (EED."
published_at: "2026-02-21"
updated_at: "2026-02-21"
keywords:
  - "Energy Efficiency Directive requirements"
  - "EED requirements"
  - "Directive (EU) 2023/1791 requirements"
  - "EED Article 11 energy audits"
  - "85 TJ energy management system"
  - "10 TJ energy audit"
  - "Annex VI minimum criteria energy audits"
  - "EN 16247 audit requirements"
  - "ISO 50001 certified energy management system"
  - "data centre reporting 500 kW"
  - "Directive (EU) 2023/1791"
  - "energy audits"
  - "EN 16247"
  - "ISO 50001"
  - "data centres"
  - "public bodies"
---
**[SORENA](https://www.sorena.io/)** - AI-Powered GRC Platform

[Home](https://www.sorena.io/) | [Solutions](https://www.sorena.io/solutions) | [Artifacts](https://www.sorena.io/artifacts) | [About Us](https://www.sorena.io/about-us) | [Contact](https://www.sorena.io/contact) | [Portal](https://app.sorena.io)

---

# EED Requirements (Directive (EU) 2023/1791)

A practical requirements breakdown of the EU Energy Efficiency Directive (EED.

*Requirements Guide* *EU*

## EU Energy Efficiency Directive (EED) Requirements

A requirements breakdown you can implement: thresholds, cadence, and evidence.

Built from Directive (EU) 2023/1791, focusing on enterprise obligations, audit quality, and data centre reporting.

EED compliance is easiest when you treat it like an operating system: define boundaries, determine which Article 11 route applies, run audits or EMS controls on a cadence, track actions and savings, and publish or report what the directive and national law require. This page translates the directive, the 2024 Commission guidance, and the data centre reporting layer into practical workstreams and an evidence map you can reuse across sites.

## Enterprise obligations (Article 11): 85 TJ vs 10 TJ thresholds

The EED sets two energy-consumption thresholds based on your average annual energy consumption over the previous three years (all energy carriers together). They determine your required route.

Treat the threshold calculation and route decision as controlled artifacts: reproducible inputs, documented conversions, and defined review triggers.

- If the 3 year average is > 85 TJ, implement an energy management system and have it certified by an independent body, commonly aligned to EN ISO 50001, with the system in place by 11 October 2027.
- If the 3 year average is > 10 TJ and you do not implement an EMS, carry out a first energy audit by 11 October 2026 and repeat at least every four years.
- Keep boundary decisions explicit, including sites, entities, carriers, acquisitions, divestitures, and annual refresh triggers.
- Where annual consumption is above the relevant threshold in a given year, be ready to make that information available to the national authority responsible for Article 11.

## Energy audit quality (Annex VI): minimum criteria

Annex VI defines minimum criteria for energy audits (including those performed as part of an energy management system).

Use these criteria as acceptance criteria for audit providers and as a QA checklist before you file and rely on the report.

- Use up-to-date, measured, traceable operational data (including electricity load profiles).
- Include a detailed review of the energy consumption profile across relevant assets (buildings, industrial operations/installations, and transport).
- Identify energy efficiency measures and the potential for cost-effective renewable energy use/production.
- Use life-cycle cost analysis where possible; keep data storable for historical analysis and tracking.

## Data centres: monitoring, publication, and annual cadence

Separate from enterprise thresholds, the EED introduces data centre monitoring, database reporting, and public availability rules based on installed IT power demand.

If triggered, treat this as a recurring reporting process with one stable perimeter, one measurement method, and versioned outputs.

- Installed IT power demand >= 500 kW, publish Annex VII information annually, subject to confidentiality protections.
- Under the delegated regulation, data centre operators report the required indicators to the European database, first by 15 September 2024 and then by 15 May 2025 and each year after that.
- Installed IT power demand >= 1 MW, expect best-practice expectations linked to the European Code of Conduct and higher scrutiny around waste heat and sustainability performance.
- Store the publication link, internal dataset, calculations, approvals, and any comparability notes when boundaries or methods change.

## Public bodies: exemplary role workstreams

Many public-sector provisions are implemented by Member States, but public bodies still need operational workflows for measurement, planning, renovation and procurement actions, and reporting.

Use the national implementation as your control source, while keeping the directive milestones and the 2024 public-sector recommendation in view.

- Annual reduction planning and reporting for public sector final energy consumption, noting that the Article 5 target remains indicative through 11 October 2027.
- Public buildings inventory and renovation planning, including the by 11 October 2025 inventory milestone and at least biennial updates.
- Procurement, incorporate energy-efficiency criteria and evidence into purchasing and contracting where national implementation requires it.

## Evidence map (requirement to owner to artifact)

Build an evidence index so each requirement is owned and has an exportable artifact. The goal is not volume, it is coherence.

A good evidence pack answers what route applies, what was done, what the findings were, what actions were taken, what was published, and how results are tracked year over year.

- Threshold route decision memo with inputs, conversions, 3 year average TJ, annual refresh date, and route outcome.
- Audit or EMS coverage plan with sites, carriers, boundaries, schedule, provider or certifier, and QA gates.
- Audit reports meeting Annex VI criteria, plus the recommendations register, concrete and feasible Action Plan, and implementation tracking.
- EMS certification evidence, including certificate, scope statement, audit dates, corrective actions, and surveillance schedule.
- Data centre publication and database package, including the dataset, calculations, publication URL, database submission, and approvals.

*Recommended next step*

*Placement: after the requirement breakdown*

## Operationalize EU Energy Efficiency Directive (EED) Requirements across ESG workflows

ESG Compliance can take EU Energy Efficiency Directive (EED) Requirements from turning the requirements into assigned actions to a reusable workflow inside Sorena. Teams working on EU Energy Efficiency Directive (EED) can keep owners, evidence, and next steps aligned without copying this guide into separate documents.

- [Open ESG Compliance for EU Energy Efficiency Directive (EED) Requirements](/solutions/esg-compliance.md): Start from EU Energy Efficiency Directive (EED) Requirements and manage cross team sustainability work, reporting, and evidence from one workflow.
- [Talk through EU Energy Efficiency Directive (EED)](/contact.md): Review your current process, evidence gaps, and next steps for EU Energy Efficiency Directive (EED) Requirements.

## Primary sources

- [Directive (EU) 2023/1791: Energy Efficiency Directive (official text)](https://eur-lex.europa.eu/eli/dir/2023/1791/oj?ref=sorena.io) - Enterprise thresholds (Article 11), audit criteria (Annex VI), data centre reporting, and penalties framework.
- [European Commission: Energy Efficiency Directive overview](https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive_en?ref=sorena.io) - Official overview and links to EED guidance notes and sector obligations.
- [EN 16247-1:2022: Energy audits (catalog summary)](https://standards.iteh.ai/catalog/standards/cen/3fbb3fd5-0106-42d0-8b9f-cb546db8465a/en-16247-1-2022?ref=sorena.io) - Practical framing of energy audit methodology and expected deliverables referenced by the directive.
- [European Commission: Energy performance of data centres](https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en?ref=sorena.io) - Commission overview of the monitoring and reporting framework for data centres.
- [Commission Recommendation (EU) 2024/2002: Article 11 guidance](https://eur-lex.europa.eu/eli/reco/2024/2002/oj/eng?ref=sorena.io) - Commission guidance on interpreting Article 11, including threshold calculation, EMS certification, audits, and Action Plan expectations.
- [Commission Delegated Regulation (EU) 2024/1364: data centre reporting scheme](https://eur-lex.europa.eu/eli/reg_del/2024/1364/oj/eng?ref=sorena.io) - Common Union reporting methodology and European database reporting details for data centres.

## Related Topic Guides

- [EED Applicability Test (Directive (EU) 2023/1791) | 85 TJ vs 10 TJ, Public Bodies, Data Centres](/artifacts/eu/energy-efficiency-directive/applicability-test.md): A practical applicability test for the EU Energy Efficiency Directive (EED.
- [EED Checklist (Directive (EU) 2023/1791) | Audit-Ready Steps for Article 11, Public Bodies, Data Centres](/artifacts/eu/energy-efficiency-directive/checklist.md): An audit-ready checklist for the EU Energy Efficiency Directive (EED, Directive (EU) 2023/1791): scope and boundary memo, 85 TJ vs 10 TJ route decision.
- [EED Compliance Program (Directive (EU) 2023/1791) | How to Operationalize Article 11, Audits, ISO 50001, Reporting](/artifacts/eu/energy-efficiency-directive/compliance.md): A practical EED compliance playbook: governance, scope control, threshold route decision (85 TJ / 10 TJ), energy audit program (Annex VI quality gates).
- [EED Deadlines & Compliance Calendar (Directive (EU) 2023/1791) | Transposition 11 Oct 2025, Data Centres 15 May](/artifacts/eu/energy-efficiency-directive/deadlines-and-compliance-calendar.md): A practical compliance calendar for the Energy Efficiency Directive, Directive (EU) 2023/1791: entry into force on 10 October 2023.
- [EED Energy Audits (Directive (EU) 2023/1791 Article 11) | Annex VI Minimum Criteria + Action Plan + Reporting](/artifacts/eu/energy-efficiency-directive/energy-audits.md): A deep-dive on EED energy audits: who must do them (>10 TJ 3-year average if no EMS), deadlines (first audit by 11 Oct 2026.
- [EED Energy Management System (EMS) (Directive (EU) 2023/1791 Article 11) | 85 TJ Threshold + ISO 50001 Certification](/artifacts/eu/energy-efficiency-directive/energy-management-systems.md): A practical guide to the EED EMS obligation: who must implement a certified energy management system (>85 TJ 3-year average).
- [EED Enforcement (Penalties) | Directive (EU) 2023/1791 Article 32 + How to Reduce Risk](/artifacts/eu/energy-efficiency-directive/penalties-and-fines.md): A practical enforcement guide for the Energy Efficiency Directive (EED): what the directive says about penalties (Article 32).
- [EED FAQ (Directive (EU) 2023/1791) | Thresholds, Audits, ISO 50001, Action Plans, Data Centres](/artifacts/eu/energy-efficiency-directive/faq.md): High-signal answers to common EED questions: how to compute the 3-year average TJ.
- [EED Reporting & Metrics (Directive (EU) 2023/1791) | Action Plans, Implementation Rate, Data Centres, Public Bodies](/artifacts/eu/energy-efficiency-directive/reporting-and-metrics.md): A practical reporting and metrics guide for EED compliance: what to track to support Article 11 thresholds and route decisions.
- [EED Scope: Who Must Comply (Directive (EU) 2023/1791) | Enterprises, Public Bodies, Data Centres](/artifacts/eu/energy-efficiency-directive/scope-and-who-must-comply.md): A grounded scope guide for the Energy Efficiency Directive (EED.
- [EED Timeline | Key Dates for Directive (EU) 2023/1791 (Transposition, Audits, EMS, Data Centres)](/artifacts/eu/energy-efficiency-directive/timeline.md): A high-signal timeline guide for the Energy Efficiency Directive, Directive (EU) 2023/1791: entry into force on 10 October 2023.
- [EED vs CSRD | How Energy Efficiency Compliance Feeds Sustainability Reporting (and What It Doesn't Replace)](/artifacts/eu/energy-efficiency-directive/energy-efficiency-directive-vs-csrd.md): A practical comparison of the Energy Efficiency Directive (EED, Directive (EU) 2023/1791) vs the Corporate Sustainability Reporting Directive (CSRD.
- [Energy Audit Report Template (EED / EN 16247) | Annex VI-Aligned Structure + Acceptance Criteria](/artifacts/eu/energy-efficiency-directive/energy-audit-report-template.md): A practical energy audit report template aligned to the EED (Directive (EU) 2023/1791) and its Annex VI minimum criteria.
- [ISO 50001 vs EED | How a Certified Energy Management System Satisfies EED Article 11 (and What EED Adds)](/artifacts/eu/energy-efficiency-directive/iso-50001-vs-energy-efficiency-directive.md): A practical comparison of ISO 50001 vs the EU Energy Efficiency Directive (EED, Directive (EU) 2023/1791): ISO 50001 is the EMS standard.


---

[Privacy Policy](https://www.sorena.io/privacy) | [Terms of Use](https://www.sorena.io/terms-of-use) | [DMCA](https://www.sorena.io/dmca) | [About Us](https://www.sorena.io/about-us)

(c) 2026 Sorena AB (559573-7338). All rights reserved.

Source: https://www.sorena.io/artifacts/eu/energy-efficiency-directive/requirements
