---
title: "EED reporting and metrics: Article 11 action plans and Article 12 data centres"
canonical_url: "https://www.sorena.io/artifacts/eu/energy-efficiency-directive/reporting-and-metrics"
source_url: "https://www.sorena.io/artifacts/eu/energy-efficiency-directive/reporting-and-metrics"
author: "Sorena AI"
description: "cited EU Energy Efficiency Directive reporting guide covering Article 11 audit action-plan records, Article 12 data-centre metrics, and Eurostat consumption indicators."
published_at: "2026-05-09"
updated_at: "2026-05-09"
keywords:
  - "Energy Efficiency Directive reporting"
  - "EED Article 11"
  - "EED Article 12"
  - "data centre energy performance"
  - "energy audit action plan"
  - "implementation rate"
  - "final energy consumption"
  - "primary energy consumption"
  - "Energy Efficiency Directive"
  - "Directive (EU) 2023/1791"
  - "Article 11"
  - "Article 12"
  - "energy audits"
  - "data centres"
  - "energy efficiency statistics"
---
**[SORENA](https://www.sorena.io/)** - AI-Powered GRC Platform

[Home](https://www.sorena.io/) | [Solutions](https://www.sorena.io/solutions) | [Artifacts](https://www.sorena.io/artifacts) | [About Us](https://www.sorena.io/about-us) | [Contact](https://www.sorena.io/contact) | [Portal](https://app.sorena.io)

---

# EED reporting and metrics: Article 11 action plans and Article 12 data centres

cited EU Energy Efficiency Directive reporting guide covering Article 11 audit action-plan records, Article 12 data-centre metrics, and Eurostat consumption indicators.

*EED* *Reporting metrics* *EU*

## EU Energy Efficiency Directive Reporting and Metrics

Build an EED reporting record around the metrics the Directive actually names: enterprise energy use, audit action plans, implementation rates, data-centre KPIs, and EU consumption indicators.

The page separates binding Article 11 and Article 12 records from statistical context so teams do not turn Eurostat indicators or Commission studies into unsupported company duties.

EED reporting and metrics should start with the reporting object. Article 11 concerns enterprises above energy-consumption thresholds, their energy management systems or energy audits, and publication of action plans and recommendation implementation rates. Article 12 concerns owners and operators of data centres above the installed IT power-demand threshold and the information monitored and published under Annex VII. EU-level primary and final energy-consumption statistics are useful context, but they are not a substitute for the enterprise or data-centre evidence file.

## Article 11 enterprise reporting record

Use Article 11 when the reporting question is about an enterprise's energy management system, audit trigger, audit action plan, or recommendation implementation rate. Directive (EU) 2023/1791 ties the enterprise trigger to average annual energy consumption over the previous three years, taking all energy carriers together.

The practical record should show the three-year consumption calculation, whether the enterprise is in the energy-management-system track or the audit track, the responsible owner for the calculation, and the evidence used to support the decision.

- Track whether average annual consumption is higher than 85 TJ over the previous three years for the energy-management-system obligation.
- Track whether average annual consumption is higher than 10 TJ over the previous three years for the energy-audit obligation where no energy management system is implemented.
- For audit-track enterprises, keep the concrete and feasible action plan based on audit recommendations.
- Record which audit recommendations are technically or economically feasible and how the implementation rate will be calculated for annual-report publication.
- Keep consumption data, audit outputs, management submission evidence, publication evidence, and any confidentiality redactions together.

Sources for this answer:

- [Directive (EU) 2023/1791 on energy efficiency](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX%3A32023L1791&ref=sorena.io) - Article 11 sets the enterprise consumption thresholds, audit timing, action-plan requirement, and publication of action plans and recommendation implementation rates.
- [Energy Efficiency Directive](https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive_en?ref=sorena.io) - The Commission overview identifies Article 11 guidance for energy management systems and energy audits and explains that the revised Directive expands audit obligations based on consumption thresholds.

*Recommended next step*

*Placement: after evidence section*

## Turn EED reporting metrics into an evidence workflow

This EED reporting guide helps separate Article 11 enterprise records, Article 12 data-centre metrics, and Eurostat policy indicators before teams publish action-plan or energy-performance evidence.

- [Open Research Copilot](/solutions/research-copilot.md): Answer Energy Efficiency Directive implementation questions with cited source material.
- [Discuss EED reporting implementation](/contact.md): Review Article 11 action-plan evidence, Article 12 data-centre metrics, and cited limits with Sorena.

## Energy-audit metrics and evidence

The audit evidence file should not stop at a completed audit report. Annex VI requires audits to be based on up-to-date, measured, traceable operational energy-consumption data and electricity load profiles where relevant, and to allow validated calculations for proposed measures.

For reporting and internal assurance, the strongest metric set is therefore: source consumption data, boundary of buildings or operations reviewed, recommended measures, feasibility decision, expected savings calculation, action-plan owner, implementation status, and publication status.

- Energy owner: maintains measured operational consumption data and load-profile inputs.
- Facilities or operations owner: confirms buildings, industrial operations, installations, and transport boundaries covered by the audit.
- Audit owner: keeps recommendation calculations and the feasibility basis for each measure.
- Management owner: records submission of the action plan to enterprise management.
- Reporting owner: publishes the action plan and implementation rate where required, after applying lawful confidentiality limits.

Sources for this answer:

- [Directive (EU) 2023/1791 on energy efficiency](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX%3A32023L1791&ref=sorena.io) - Annex VI supports the audit evidence list by requiring measured, traceable data, review of energy-consumption profiles, identified measures, validated calculations, and data storage for historical analysis.
- [Energy Efficiency Directive](https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive_en?ref=sorena.io) - The Commission overview links Article 11 to energy-management and audit guidance and frames audits as part of industrial energy-savings optimisation.

## Article 12 data-centre metrics

Use Article 12 when the reporting question concerns owners or operators of data centres. The Directive applies the publication duty to data centres with installed IT power demand of at least 500 kW, unless the defence and civil-protection exclusion applies.

Annex VII gives the minimum monitored and published information. The data record should therefore identify the data centre, owner, operator, operation start date, municipality, floor area, installed power, data traffic, data stored and processed, and last-full-calendar-year performance KPIs.

- Identity metrics: data-centre name, owner, operators, start-of-operations date, and municipality.
- Capacity metrics: floor area, installed power, incoming and outgoing data traffic, and data stored and processed.
- Performance metrics: energy consumption, power utilisation, temperature set points, waste-heat utilisation, water usage, and renewable-energy use.
- Reporting destination: European database for data-centre energy performance and water-footprint information.
- Publication controls: separate publishable Annex VII information from trade-secret or confidential information before release.

Sources for this answer:

- [Directive (EU) 2023/1791 on energy efficiency](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX%3A32023L1791&ref=sorena.io) - Article 12 and Annex VII support the 500 kW installed IT power-demand trigger and the minimum data-centre identity, capacity, and performance metrics.
- [Energy performance of data centres](https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en?ref=sorena.io) - The Commission data-centre page explains that the EED introduced monitoring and reporting of data-centre energy performance and that a European database collects and publishes relevant energy-performance and water-footprint data.
- [Commission adopts EU-wide scheme for rating sustainability of data centres](https://energy.ec.europa.eu/news/commission-adopts-eu-wide-scheme-rating-sustainability-data-centres-2024-03-15_en?ref=sorena.io) - The Commission announcement supports the reporting deadlines for data-centre KPIs and states that Article 12 also requires publication of energy-performance and sustainability information under Annex VII.

## EU consumption indicators for context

EU-wide primary and final energy-consumption indicators belong in dashboards and policy context, not in an enterprise-specific Article 11 record unless the enterprise separately maps its own consumption to those indicators. Eurostat's energy-efficiency metadata explains that the indicators monitor progress toward 2020 and 2030 targets under Directive 2012/27/EU and Directive (EU) 2023/1791.

When teams cite EU consumption data, state the unit, reference year, and target-distance method. Eurostat describes primary and final energy consumption as Mtoe indicators drawn from energy balances, with distance to target calculated in absolute Mtoe and relative percentage terms.

- Use final energy consumption for energy consumed by end users, not losses in transformation and distribution.
- Use primary energy consumption when the metric needs energy-system inputs before transformation losses.
- Do not convert Eurostat EU aggregate gaps into company-level compliance gaps unless a separate methodology supports that claim.
- Label 2024 EU figures as statistical context: 1,202 Mtoe primary energy consumption, 21.1% away from the 2030 target; final energy consumption 18.0% away from the 2030 target.
- Keep the data vintage with the citation because Eurostat pages and datasets are updated.

Sources for this answer:

- [Energy efficiency statistics](https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Energy_efficiency_statistics&ref=sorena.io) - Eurostat provides the 2024 EU primary and final energy-consumption figures and their distance from the 2030 targets.
- [Energy efficiency metadata (nrg_ind_eff)](https://ec.europa.eu/eurostat/api/dissemination/files?file=metadata/nrg_ind_eff_esmsip2.sdmx.zip&ref=sorena.io) - Eurostat metadata supports the use of primary and final energy consumption as Mtoe indicators and explains the absolute and relative distance-to-target calculations.
- [Final energy consumption metadata (sdg_07_11)](https://ec.europa.eu/eurostat/api/dissemination/files?file=metadata/sdg_07_11_esmsip2.sdmx.zip&ref=sorena.io) - Eurostat SDG metadata defines final energy consumption as energy consumed by end users while excluding energy-sector consumption and transformation or distribution losses.

## Limits and blocked claims

Keep the reporting page inside the sourced limits. The cited sources support Article 11 thresholds, audit-action-plan publication, Article 12 data-centre reporting, Annex VI audit evidence, Annex VII data-centre metrics, Commission data-centre reporting context, and Eurostat EU consumption indicators.

It does not support a universal Member State penalty table, a company-specific implementation-rate formula, a claim that all data-centre reporting fields are public without confidentiality screening, or a full Member State-by-Member State status map. Those claims should stay out of public copy until a specific source is added.

- Do not state penalties, sanctions, or enforcement escalation dates without Member State source material.
- Do not invent implementation-rate numerator or denominator rules beyond the Article 11 publication requirement.
- Do not publish data-centre confidential or trade-secret information; Article 12 and Article 11 both preserve confidentiality limits.
- Do not cite Eurostat EU target-distance data as evidence that an individual enterprise has met or missed its Article 11 duties.

Sources for this answer:

- [Directive (EU) 2023/1791 on energy efficiency](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX%3A32023L1791&ref=sorena.io) - The Directive source supports the Article 11 and Article 12 limits used in this page, including confidentiality qualifications and the specific minimum data fields.
- [Energy efficiency metadata (nrg_ind_eff)](https://ec.europa.eu/eurostat/api/dissemination/files?file=metadata/nrg_ind_eff_esmsip2.sdmx.zip&ref=sorena.io) - Eurostat metadata supports the warning that EU-level consumption indicators monitor policy target distance rather than enterprise-level Article 11 compliance.

## Primary sources

- [Directive (EU) 2023/1791 on energy efficiency](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX%3A32023L1791&ref=sorena.io) - Primary legal source for Article 11 energy management systems and audits, Article 12 data-centre reporting, Annex VI audit evidence, and Annex VII data-centre metrics.
  - Quote: "Energy management systems and energy audits"
- [Energy Efficiency Directive](https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive_en?ref=sorena.io) - Commission overview used for current EED context, Article 11 guidance references, audit obligations, data-centre provisions, and headline energy-consumption targets.
  - Quote: "The revised Energy Efficiency Directive (EU/2023/1791)"
- [Energy performance of data centres](https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en?ref=sorena.io) - Commission data-centre source used for European database context, monitoring and reporting of energy performance, water-footprint data, and data-centre reporting scheme materials.
  - Quote: "European database, prepared by the Commission"
- [Commission adopts EU-wide scheme for rating sustainability of data centres](https://energy.ec.europa.eu/news/commission-adopts-eu-wide-scheme-rating-sustainability-data-centres-2024-03-15_en?ref=sorena.io) - Commission announcement used for data-centre KPI reporting deadlines, Article 12 publication context, and the link to the Action Plan for the Digitalisation of the Energy Sector.
  - Quote: "15 September 2024 and then by 15 May"
- [Energy efficiency statistics](https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Energy_efficiency_statistics&ref=sorena.io) - Eurostat article used for EU 2024 primary and final energy-consumption figures and their distance from the 2030 targets.
  - Quote: "final energy consumption in the EU was 18.0% away"
- [Energy efficiency metadata (nrg_ind_eff)](https://ec.europa.eu/eurostat/api/dissemination/files?file=metadata/nrg_ind_eff_esmsip2.sdmx.zip&ref=sorena.io) - Eurostat metadata used for the indicator methodology: primary and final energy consumption in Mtoe and absolute or relative distance-to-target calculations.
  - Quote: "Primary energy consumption has to be measured in Mtoe"
- [Final energy consumption metadata (sdg_07_11)](https://ec.europa.eu/eurostat/api/dissemination/files?file=metadata/sdg_07_11_esmsip2.sdmx.zip&ref=sorena.io) - Eurostat SDG metadata used for the definition of final energy consumption as end-user consumption excluding energy-sector use and transformation or distribution losses.
  - Quote: "energy consumed by end users"

## Related Topic Guides

- [Annex VI energy audit criteria under the EU Energy Efficiency Directive](/artifacts/eu/energy-efficiency-directive/annex-vi-audits.md): An official source guide to the Annex VI minimum criteria for EU Energy Efficiency Directive energy audits: data quality, representative scope, LCCA, calculations, recommendations, and evidence.
- [Does ISO 50001 satisfy Article 11 of the EU Energy Efficiency Directive?](/artifacts/eu/energy-efficiency-directive/faq/iso-50001-equivalence.md): FAQ on when ISO 50001 can support the Energy Efficiency Directive Article 11 energy-management-system route, when an energy audit is still needed, and what evidence to keep.
- [EED Article 11 action plans and national planning context](/artifacts/eu/energy-efficiency-directive/action-plans.md): How EU Energy Efficiency Directive action plans work: Article 11 audit-based enterprise plans, management approval, publication evidence, and the difference from national NEEAP and NECP planning.
- [EED Article 11 corporate group and site aggregation FAQ](/artifacts/eu/energy-efficiency-directive/faq/corporate-group-and-site-aggregation.md): How to calculate EU Energy Efficiency Directive Article 11 enterprise thresholds across sites, energy carriers, and national transposition rules.
- [EED Article 11 threshold calculation: 85 TJ and 10 TJ FAQ](/artifacts/eu/energy-efficiency-directive/faq/threshold-calculation.md): How to calculate EU Energy Efficiency Directive Article 11 enterprise thresholds using the previous three-year average, all energy carriers, and auditable evidence records.
- [EED Article 12 data centre reporting threshold and cadence](/artifacts/eu/energy-efficiency-directive/faq/data-centre-thresholds-and-reporting.md): FAQ on the EU Energy Efficiency Directive Article 12 data centre threshold, reporting cadence, Annex VII data categories, Commission database, and evidence to retain.
- [EED energy audit report contents: what should be included?](/artifacts/eu/energy-efficiency-directive/faq/audit-report-contents.md): FAQ on EU Energy Efficiency Directive audit report contents, covering Annex VI criteria, EN 16247 context, evidence, recommendations, and action-plan linkage.
- [EED National Transposition Evidence](/artifacts/eu/energy-efficiency-directive/national-transposition-evidence.md): How to evidence national transposition of Directive (EU) 2023/1791 without inventing Member State obligations: EU proof points, national-law checks, retained records, and source limits.
- [EED penalties: what does Directive (EU) 2023/1791 require?](/artifacts/eu/energy-efficiency-directive/faq/penalties.md): FAQ on EU Energy Efficiency Directive penalties, Member State enforcement rules, and the audit, energy-management, action-plan, and reporting evidence that reduces enforcement risk.
- [EED Public Bodies FAQ: 1.9% Reduction and 3% Renovation Duties](/artifacts/eu/energy-efficiency-directive/faq/public-bodies.md): FAQ on EU Energy Efficiency Directive public-body duties: who is in scope, the 1.9% final energy consumption reduction, 3% public-building renovation rule, caveats, and records.
- [EED public body obligations: 1.9% energy reduction and 3% renovation](/artifacts/eu/energy-efficiency-directive/public-body-obligations.md): cited guide to EU Energy Efficiency Directive public-body duties: Article 5 final-energy reduction, Article 6 building renovation, inventories, caveats, and evidence.
- [EED threshold triage workflow for 10 TJ and 85 TJ routes](/artifacts/eu/energy-efficiency-directive/threshold-triage-workflow.md): An official source workflow for collecting all energy carriers, calculating the three-year average, and routing EED audit or energy-management-system actions.
- [EED vs EPBD: Energy Efficiency and Building Performance](/artifacts/eu/energy-efficiency-directive/eed-vs-epbd.md): Compare the EU Energy Efficiency Directive with EPBD building-performance workstreams for enterprise energy audits, energy management, public-sector duties, data centres, and building certificates.
- [EN 16247-1 audit structure under the EU Energy Efficiency Directive](/artifacts/eu/energy-efficiency-directive/en-16247-audit-structure.md): How to structure an EN 16247-1 energy audit for EED Article 11 and Annex VI: scope, data, site work, analysis, report outputs, recommendations, and evidence.
- [Energy Efficiency Directive vs CSRD](/artifacts/eu/energy-efficiency-directive/energy-efficiency-directive-vs-csrd.md): Compare EED operational energy duties with CSRD sustainability reporting work, including where EED audit, energy-management and data-centre evidence may be reused.
- [EU EED 85 TJ and 10 TJ enterprise thresholds under Article 11](/artifacts/eu/energy-efficiency-directive/85-tj-and-10-tj-enterprise-thresholds.md): Article 11 guidance for enterprises checking the EU Energy Efficiency Directive 85 TJ energy-management-system threshold and 10 TJ energy-audit threshold.
- [EU EED Article 11 Energy Audits: 10 TJ threshold, cadence, and evidence](/artifacts/eu/energy-efficiency-directive/energy-audits.md): Official source guide to Energy Efficiency Directive Article 11 energy audit obligations, including the 10 TJ trigger, four-year cadence, Annex VI criteria, EN 16247 relation, and action-plan evidence.
- [EU EED Article 12 data centre reporting and performance](/artifacts/eu/energy-efficiency-directive/data-centre-reporting-and-performance.md): Article 12 of the EU Energy Efficiency Directive requires qualifying data centre owners and operators to publish annual energy performance information and feed the European database.
- [EU EED audit frequency: Article 11 cadence and EMS route](/artifacts/eu/energy-efficiency-directive/faq/audit-frequency.md): FAQ on EU Energy Efficiency Directive Article 11 audit frequency: 10 TJ and 85 TJ energy-consumption thresholds, first audit timing, four-year cadence, EMS alternative, and evidence.
- [EU EED Data Centre Reporting Workflow](/artifacts/eu/energy-efficiency-directive/data-centre-reporting-workflow.md): Workflow for identifying in-scope EU data centres, collecting Annex VII energy-performance data, checking evidence, and preparing annual EED reporting.
- [EU EED Implementation Rate Tracking: evidence fields and caveats](/artifacts/eu/energy-efficiency-directive/implementation-rate-tracking.md): Track Energy Efficiency Directive implementation without inventing a headline rate: NECP action status, Eurostat distance-to-target data, audit scheme records, owners, and transposition caveats.
- [EU Energy Efficiency Directive action plan evidence workflow](/artifacts/eu/energy-efficiency-directive/action-plan-evidence-workflow.md): Build an evidence workflow for EU Energy Efficiency Directive energy-audit and energy-management action plans, including records, owners, tracking fields, and review triggers.
- [EU Energy Efficiency Directive Applicability Test: 85 TJ, 10 TJ, Data Centres](/artifacts/eu/energy-efficiency-directive/applicability-test.md): Check whether an enterprise, public body, or data centre falls under Energy Efficiency Directive duties for energy management systems, audits, public-sector energy use, public buildings, or Article 12 data-centre reporting.
- [EU Energy Efficiency Directive Article 11 EMS vs Energy Audit Route](/artifacts/eu/energy-efficiency-directive/ems-vs-audit-route-workflow.md): Compare Article 11 EMS and energy audit routes under Directive (EU) 2023/1791: 85 TJ and 10 TJ thresholds, three-year average consumption, Annex VI audit criteria, outputs, and evidence.
- [EU Energy Efficiency Directive Article 11 energy management systems](/artifacts/eu/energy-efficiency-directive/energy-management-systems.md): Article 11 EMS guide for enterprises above the 85 TJ threshold, covering certified energy management systems, audit links, action plans, energy data, and evidence.
- [EU Energy Efficiency Directive checklist for enterprise energy audits, EMS, data centres and public-sector duties](/artifacts/eu/energy-efficiency-directive/checklist.md): Checklist for Directive (EU) 2023/1791 covering enterprise energy-consumption thresholds, energy management systems, energy audits, Annex VI evidence, data-centre reporting and public-sector checks.
- [EU Energy Efficiency Directive compliance: audits, EMS, data centres](/artifacts/eu/energy-efficiency-directive/compliance.md): Official source EU Energy Efficiency Directive compliance guide covering Article 11 energy management and audit thresholds, data-centre reporting, public-body duties, owners, and evidence.
- [EU Energy Efficiency Directive deadlines and compliance calendar](/artifacts/eu/energy-efficiency-directive/deadlines-and-compliance-calendar.md): Calendar of cited EU Energy Efficiency Directive dates for transposition, Article 11 energy audits and EMS duties, data-centre reporting, and public-sector obligations.
- [EU Energy Efficiency Directive energy audit report template](/artifacts/eu/energy-efficiency-directive/energy-audit-report-template.md): An official source energy audit report template for EED Article 11 and Annex VI: scope, measured consumption data, analysis, life-cycle costing, recommendations, owners, action-plan links, and evidence.
- [EU Energy Efficiency Directive FAQ](/artifacts/eu/energy-efficiency-directive/faq.md): Answers to common EU Energy Efficiency Directive questions on Article 11 thresholds, energy audits, energy management systems, data centres, public bodies, penalties, audit reports, and reporting overlap.
- [EU Energy Efficiency Directive metering and billing requirements](/artifacts/eu/energy-efficiency-directive/metering-and-billing.md): An official source guide to EED metering, sub-metering, remote reading, billing information, consumption data access, and customer-facing records.
- [EU Energy Efficiency Directive penalties and enforcement risk](/artifacts/eu/energy-efficiency-directive/penalties-and-fines.md): Article 32 of the EU Energy Efficiency Directive leaves penalties to Member States. This page helps understand the EU-level rule, the limits of EU-wide fine claims, and the evidence that lowers enforcement risk.
- [EU Energy Efficiency Directive requirements: Article 11, audits, data centres](/artifacts/eu/energy-efficiency-directive/requirements.md): Official source guide to core EED requirements: Article 11 EMS and audit thresholds, Annex VI audit criteria, data-centre reporting, public-body duties, action plans, and evidence.
- [EU Energy Efficiency Directive scope: who must comply](/artifacts/eu/energy-efficiency-directive/scope-and-who-must-comply.md): cited EED scope guide for undertakings, public bodies, data centres, energy-consumption thresholds, audits, energy management systems, and national transposition checks.
- [How can EED records support CSRD and ESRS E1 evidence?](/artifacts/eu/energy-efficiency-directive/faq/csrd-and-esrs-e1-overlap.md): FAQ on using EU Energy Efficiency Directive audit, management-system, and data-centre records as evidence inputs for sustainability reporting without treating EED as CSRD or ESRS advice.
- [ISO 50001 vs EU Energy Efficiency Directive](/artifacts/eu/energy-efficiency-directive/iso-50001-vs-energy-efficiency-directive.md): Compare ISO 50001 evidence with EU Energy Efficiency Directive Article 11 obligations for the 85 TJ energy-management-system route and 10 TJ audit route.
- [Timeline for Energy Efficiency Directive: practical implementation guide](/artifacts/eu/energy-efficiency-directive/timeline.md): Practical Energy Efficiency Directive guidance for Timeline, with cited decisions, owners, evidence records, and implementation steps.


---

[Privacy Policy](https://www.sorena.io/privacy) | [Terms of Use](https://www.sorena.io/terms-of-use) | [DMCA](https://www.sorena.io/dmca) | [About Us](https://www.sorena.io/about-us)

(c) 2026 Sorena AB (559573-7338). All rights reserved.

Source: https://www.sorena.io/artifacts/eu/energy-efficiency-directive/reporting-and-metrics
