title: "Network access permit application evidence template"
canonical_url: "https://www.sorena.io/artifacts/apac/china-telecom-wireless-regulation/network-access-permit-application-evidence-template"
source_url: "https://www.sorena.io/artifacts/apac/china-telecom-wireless-regulation/network-access-permit-application-evidence-template"
author: "Sorena AI"
description: "Model-level evidence index for a China telecom equipment network-access permit, from catalogue decision and applicant records through trial evidence, filing, approval and renewal."
published_at: "2026-07-05"
updated_at: "2026-07-24"
keywords:
  - "China telecom"
  - "Network access permit"
  - "Radio management"
  - "Wireless equipment"
  - "Mobile terminal apps"
---
**[SORENA](https://www.sorena.io/)** - AI-Powered GRC Platform

[Home](https://www.sorena.io/) | [Solutions](https://www.sorena.io/solutions) | [Artifacts](https://www.sorena.io/artifacts) | [About Us](https://www.sorena.io/about-us) | [Contact](https://www.sorena.io/contact) | [Portal](https://app.sorena.io)

---

# Network access permit application evidence template

Model-level evidence index for a China telecom equipment network-access permit, from catalogue decision and applicant records through trial evidence, filing, approval and renewal.

*Product* *China*

## China Telecom and Wireless Network access permit application evidence template

Build the evidence file for a China telecom equipment network-access permit, including the catalogue decision, applicant records, trial evidence, filing history, approval and renewal.

This working index follows the MIIT government-service guide but does not replace the official form, current equipment-specific catalogue entry, checklist or online filing fields.

Use this template after confirming that the exact model needs a network access permit because it falls within the current telecom-equipment directory and will connect to a public telecommunications network or be sold in China. The applicant's regulatory owner should maintain one record per model, mark each item applicable, not applicable with a reason, pending or complete, and link every entry to the controlled evidence. This working index does not replace the MIIT application form or the equipment-specific checklist.

## Definitions

### China telecom equipment network access permit

**Term:** network access permit

A network access permit is MIIT's approval for a listed model of telecom terminal equipment, radio communication equipment, or interconnection equipment that will connect to a public telecommunications network or be sold in China. The permit applies to the approved finished model and does not replace radio transmitting equipment model approval or a deployment-specific radio station licence.

**Why it matters here:** Use this evidence template only after the finished model has been matched to the current MIIT equipment directory. Keep the catalogue decision, approved configuration, permit record, mark data, and later changes tied to that model.

Sources:

- [MIIT Telecom Equipment Network Access Management Measures](https://www.miit.gov.cn/gyhxxhb/jgsj/cyzcyfgs/bmgz/xxtxl/art/2024/art_416e5b8aa84341658e4301c99405e7ae.html?ref=sorena.io)
- [MIIT Telecom Equipment Network Access Licensing Service Guide](https://jwxkwap.miit.gov.cn/fwzn?ref=sorena.io)

## Scope and responsibility record

Begin with an approved scope decision. State the exact catalogue equipment name, the product facts that match it, and how the equipment will connect to a public telecommunications network. Do not use a supplier certificate or a generic description such as 'IoT device' as the scope conclusion.

- Record ID and status: model, product name, hardware and software version, public-network interfaces, intended use, current catalogue entry, decision owner, approval date and source version checked.
- Responsible entities: applicant, legal manufacturer, production enterprise, production site, after-sales owner and the person accountable for application accuracy and post-approval consistency.
- Different applicant and manufacturer: signed manufacturing or processing agreement and the entity evidence required for both parties.
- Overseas entity: overseas registration evidence, the agent in China acting as applicant, the agent's valid business licence and the overseas applicant's authorization.
- Permit route: ordinary network-access permit or trial approval. Record whether the model is treated as new telecom equipment because a formal national or industry standard is absent or it is outside the first catalogue, and cite the route decision.

Sources for this answer:

- [MIIT telecom equipment network access permit service](https://ythzxfw.miit.gov.cn/bssx/axy/dxhhlw/art/2020/art_10a59e9f0d3741f8823e1990ae779733.html?ref=sorena.io) - States the public-network and catalogue scope, identifies ordinary and trial approvals, and lists evidence for domestic applicants, overseas applicants, agents and different manufacturing entities.

## Application-material index

Index the final Chinese-language filing set by document owner, version, signature or seal status, file location and submission status. Foreign-language certificates and licences need corresponding Chinese translations. The application is filed online; if the applicant does not use an electronic signature, the signed and sealed paper original of the application form must arrive no later than collection of the administrative decision.

- Application form: one MIIT-format form signed by the applicant's legal representative or authorized agent and bearing the applicant's seal; add the signed and sealed manufacturing agreement when applicant and manufacturer are different legal persons.
- Entity records: applicant business licence or overseas registration; China agent licence and authorization for an overseas applicant; and the manufacturer's records when it is a different entity.
- Applicant and manufacturing profile: production conditions, instrument configuration, quality-assurance system and after-sales measures, plus documents covering repair, replacement and return responsibilities where national rules require them.
- Quality system: certification certificate or a qualifying audit body's report; when applicant and manufacturer differ, index the manufacturer's certificate or audit report.
- Equipment description: functions, performance indicators, principle block diagram, internal and external photographs, and instructions for use.
- Conformity evidence: the required test report or product certification issued by an eligible telecom-equipment testing or certification body. For radio transmitting equipment, include the radio model-approval certificate when required. Identify the tested model and configuration and map each report or certificate to the current equipment-specific requirement.

Sources for this answer:

- [MIIT telecom equipment network access permit service](https://ythzxfw.miit.gov.cn/bssx/axy/dxhhlw/art/2020/art_10a59e9f0d3741f8823e1990ae779733.html?ref=sorena.io) - Lists the language, form, entity, profile, quality-system, equipment-description, testing and electronic-submission requirements.
- [MIIT Telecom Equipment Network Access Management Measures](https://www.miit.gov.cn/gyhxxhb/jgsj/cyzcyfgs/bmgz/xxtxl/art/2024/art_416e5b8aa84341658e4301c99405e7ae.html?ref=sorena.io) - Article 9 identifies the application evidence, including the radio transmitting equipment model-approval certificate for radio transmitting equipment.

## Network trial and review record

For radio communication equipment, equipment involving interconnection, and new telecom equipment, retain evidence of a network trial lasting at least three months on a telecommunications network in China or an MIIT-designated simulated test network. The service guide requires both an overall technical plan and a report from the trial unit.

- Overall technical plan: product overview; design basis and applied standards; system composition and function block diagram; hardware and software structure; supported services; interfaces and compatibility; performance and technical indicators; networking capability; reliability and environmental design; and operation, maintenance and management.
- Trial report: dates and location; installed capacity and actual user count; network diagram; services provided; consistency and compatibility tests and data; faults and corrective measures; user feedback; and the trial unit's opinion.
- Expert review: record whether MIIT organizes review of the technical plan, trial report or test reports. Keep requests, submitted versions, meeting material and responses. MIIT states that expert review is completed within 45 days and that this time is excluded from the approval period.
- Submission history: online receipt, application version, acceptance notice, any single correction notice issued at filing or within five working days, corrected material and the final decision. MIIT states a 60-day decision period for a complete and formally compliant application.

Sources for this answer:

- [MIIT telecom equipment network access permit service](https://ythzxfw.miit.gov.cn/bssx/axy/dxhhlw/art/2020/art_10a59e9f0d3741f8823e1990ae779733.html?ref=sorena.io) - Defines the three-month trial trigger and required plan and report contents, and states the correction, decision and expert-review periods.

## Decision, marking and lifecycle register

Keep the file open after approval. The permit holder must preserve consistency between the approved equipment and production, apply the network-access mark, manage changes and renew before expiry when production and sale will continue.

- Decision record: ordinary permit or trial approval, certificate number, approved model and particulars, decision date, delivery date, reasons attached to any refusal, and a copy of the issued document.
- Validity: record the exact expiry printed on the document. An ordinary permit is generally valid for three years. MIIT's reform notice extended a network trial approval to two years from 1 March 2023, superseding the service guide's older one-year statement.
- Mark control: network-access or trial mark order, receipt, storage, allocation, application to equipment and reconciliation by production lot. Do not apply a mark to equipment without a valid approval.
- Production baseline: approved hardware, software, exterior, interfaces, test samples and manufacturing site, with evidence that released units remain consistent with the approved equipment.
- Change assessment: technical and exterior changes may require testing or a new permit; a change to information stated on the permit requires a new permit. Record the decision before implementing the change.
- Renewal: if production and sale will continue, set the filing date at least three months before permit expiry, retain the new application package and track return of the original certificate. After expiry, confirm the current MIIT route rather than treating the filing as an on-time renewal.

Sources for this answer:

- [MIIT telecom equipment network access permit service](https://ythzxfw.miit.gov.cn/bssx/axy/dxhhlw/art/2020/art_10a59e9f0d3741f8823e1990ae779733.html?ref=sorena.io) - States the approval outputs, delivery timing, general validity periods, equipment-consistency and marking duties, change handling and three-month pre-expiry renewal requirement.
- [MIIT Notice on Reforms to the Telecom Equipment Network Access Licensing System](https://www.miit.gov.cn/jgsj/xgj/gzdt/art/2023/art_b6acbbc5653347e2bc1d113457cdaa4a.html?ref=sorena.io) - Extends network trial approvals to two years and establishes online filing for qualifying contract-manufacturer, technical and appearance changes from 1 March 2023.

*Operationalize the requirement*

*Placement: Before cited sources*

## Prepare the China connected-device launch file

Connect the applicable China route, cited source, accountable owner, approval, product configuration and change history in one reviewable model file.

- [Map cited sources to evidence](/solutions/research-copilot.md): Research Copilot connects the citation, decision, owner, retained evidence, and change history.
- [Review the China route](/contact.md): Review unresolved equipment classification, approval, transition or product-change questions before release.

## Primary sources

- [MIIT telecom equipment network access permit service](https://ythzxfw.miit.gov.cn/bssx/axy/dxhhlw/art/2020/art_10a59e9f0d3741f8823e1990ae779733.html?ref=sorena.io) - Official government-service page for scope, applicant conditions, materials, filing, network trials, review, approval, validity, marking, changes and renewal.
- [MIIT Telecom Equipment Network Access Management Measures](https://www.miit.gov.cn/gyhxxhb/jgsj/cyzcyfgs/bmgz/xxtxl/art/2024/art_416e5b8aa84341658e4301c99405e7ae.html?ref=sorena.io) - Current consolidated departmental rule for permit scope, application evidence, the radio model-approval certificate dependency and approved-model control.
- [MIIT Notice on Reforms to the Telecom Equipment Network Access Licensing System](https://www.miit.gov.cn/jgsj/xgj/gzdt/art/2023/art_b6acbbc5653347e2bc1d113457cdaa4a.html?ref=sorena.io) - Later official source for two-year trial approvals and qualifying product-family change filings effective 1 March 2023.

## Related Topic Guides

- [2400MHz, 5100MHz and 5800MHz radio equipment rules](/artifacts/apac/china-telecom-wireless-regulation/radio-equipment-2400-5100-5800-mhz.md): Band-specific China radio management requirements, implementation timing, and equipment evidence for products using these bands.
- [China network access vs radio management](/artifacts/apac/china-telecom-wireless-regulation/china-network-access-vs-radio-approval.md): Crosswalk separating telecom network access licensing from radio transmitting equipment management for connected products.
- [China telecom and wireless deadlines and compliance calendar](/artifacts/apac/china-telecom-wireless-regulation/deadlines-and-compliance-calendar.md): China telecom and wireless commencement dates, permit lead times, renewals, transitions, and change-triggered filings.
- [China telecom and wireless equipment requirements](/artifacts/apac/china-telecom-wireless-regulation/requirements.md): China network access, radio management, micro-power equipment, and mobile terminal app requirements for connected-device launch teams.
- [China Telecom and Wireless FAQ](/artifacts/apac/china-telecom-wireless-regulation/faq.md): China connected-device FAQ covering network access permits, radio model approval, station licensing, 2400/5100/5800MHz rules and preinstalled mobile apps.
- [China telecom and wireless launch checklist](/artifacts/apac/china-telecom-wireless-regulation/checklist.md): Release-gate checklist for China network access permits, radio band rules, micro-power equipment and preinstalled mobile apps.
- [China telecom and wireless penalties and enforcement exposure](/artifacts/apac/china-telecom-wireless-regulation/penalties-and-fines.md): China penalties for unlicensed telecom equipment, radio model approval, station licensing, interference, and mobile app violations.
- [China Telecom Equipment Network Access Permit Workflow](/artifacts/apac/china-telecom-wireless-regulation/telecom-equipment-network-access-license.md): Decide whether equipment needs a China network access permit, then prepare the applicant, test, application, mark, renewal and change evidence.
- [Connected device China launch workflow](/artifacts/apac/china-telecom-wireless-regulation/connected-device-china-launch-workflow.md): Decide which China network-access, radio, micro-power and mobile-terminal app requirements apply to a connected-device model, then control the evidence through release.
- [Do preinstalled mobile apps have special China requirements?](/artifacts/apac/china-telecom-wireless-regulation/faq/do-preinstalled-mobile-apps-have-special-china-requirements.md): Yes. Covered mobile smart terminals have China-specific duties for app disclosure, consent, uninstallability, upgrade behavior, distribution controls and network-access consistency.
- [Does my connected device need a China network access permit?](/artifacts/apac/china-telecom-wireless-regulation/faq/does-my-connected-device-need-china-network-access-permit.md): Not every connected device needs a China network access permit. Check public-network connection, the current MIIT equipment directory, and the 2023 licensing reforms.
- [Is radio management separate from network access in China?](/artifacts/apac/china-telecom-wireless-regulation/faq/is-radio-management-separate-from-network-access-in-china.md): Yes. China network access and radio management use different scope tests and approvals. A product can need both, one, or neither.
- [Micro-power short-range radio equipment rules](/artifacts/apac/china-telecom-wireless-regulation/micro-power-short-range-radio-equipment.md): How to use the micro-power short-range radio equipment catalogue and technical requirements in China launch triage.
- [Mobile terminal preinstalled app requirements](/artifacts/apac/china-telecom-wireless-regulation/mobile-terminal-preinstalled-apps.md): China mobile smart terminal preinstallation and distribution duties for device makers and app distribution workflows.
- [Preinstalled app user rights and removal checks](/artifacts/apac/china-telecom-wireless-regulation/preinstalled-app-user-rights-and-removal.md): Practical checks for mobile terminal preinstalled app distribution, user-facing controls, and cited evidence.
- [What changed for 2400MHz, 5100MHz and 5800MHz equipment?](/artifacts/apac/china-telecom-wireless-regulation/faq/what-changed-for-2400-5100-5800-mhz-equipment.md): MIIT's 2021 notice revised band uses, radio technical limits, interference controls, model approval and station licensing for 2400MHz, 5100MHz and 5800MHz equipment.
- [What evidence is needed for a network access permit?](/artifacts/apac/china-telecom-wireless-regulation/faq/what-evidence-is-needed-for-a-network-access-permit.md): China network-access permit evidence: Chinese application forms, applicant and manufacturer records, quality evidence, product description, test or certification records, and any required network-trial file.


---

[Privacy Policy](https://www.sorena.io/privacy.md) | [Terms of Use](https://www.sorena.io/terms-of-use.md) | [DMCA](https://www.sorena.io/dmca.md) | [About Us](https://www.sorena.io/about-us.md)

(c) 2026 Sorena AB (559573-7338). All rights reserved.

Source: https://www.sorena.io/artifacts/apac/china-telecom-wireless-regulation/network-access-permit-application-evidence-template.md